Tag Archives: screeding

Screeds at the Shard


The skyline of London has changed a lot over the last few decades; starting in 1991 with the appearance of One Canada Square and its neighbouring Canary Wharf tower blocks. In 1999 the London Eye appeared on the horizon at … Continue reading

Posted in Architects, Concrete, screed | Tagged , , , , , , , | Leave a comment

Waterproofing in Manila


Mandarin Hotel – Manila Monoprufe WP Elastic and Ronafix Mix A1 were used for waterproofing and screeding the roof deck areas, Kipling’s Bar, GM apartment, main entrance front, canopy, smoking area, wing A, wing C, parapet walls and atrium.  

Posted in screed, Waterproofing | Tagged , , , , , ,

Fast drying screed keeps things moving at Heathrow Terminal 2


Terminal 2 at London Heathrow Airport is being replaced as part of a £4.8bn development programme at the airport. The Terminal 2 project which is estimated to cost around £2.5bn includes the main building, a 522-metre satellite pier, a 1,340 … Continue reading

Posted in Uncategorized | Tagged , , , | Leave a comment

Ronafix Pre-packed Screed at Sidney Sussex College


South Court is a Grade II Listed Building owned by Sidney Sussex College, part of the University of Cambridge.  Building Surveyors and Architects Pleasance Hookham and Nix Limited were commissioned to refurbish the property and part of the work required … Continue reading

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Fast drying screed means time saving at Greenwich school


Eltham Hill Technology College was one of five schools transformed by the London Borough of Greenwich as part of Building Schools for the Future. The project was 80% new build and 20% refurbishment. The new build involved the provision of … Continue reading

Posted in screed | Tagged , , , , , , , , , , , , , | Leave a comment

Accelerated screed for accelerated learning


School holidays are the perfect time for schools to develop their sites – especially on floors, when the kids and the teachers are off relaxing or studying and contractors have days or weeks to get in, remove the old and … Continue reading

Posted in Uncategorized | Tagged , , , , | Leave a comment