Tag Archives: dpm

Tate Library, Streatham – RonaScreed 4 Day Overlay Quick Drying Screed and RonaFloor Epoxy DPM


RonaFloor Epoxy DPM was used to provide a surface DPM to a concrete base before application of RonaScreed 4 Day Overlay Quick Drying Screed at a refurbishment project at the Tate Library in Streatham. The Tate Library in Streatham opened … Continue reading

Posted in Architects, Library, screed | Tagged , , , , , , , | Leave a comment

Ronacrete joins RIBA CPD Providers Network


Ronacrete have joined the RIBA* CPD Providers Network and can now offer a RIBA Approved CPD to architect firms. The CPD entitled Guide to specifying modified screeds has been assessed by RIBA and categorised under: Core Curriculum Subjects Designing and … Continue reading

Posted in Architects, screed | Tagged , , , , , , , , , , , , , , , , , , , , , , , , , | Leave a comment

Read about our screeds


We sent out a screeding newsletter today, you can read it here.  If you would like to subscribe to our newsletters contact us here.  

Posted in screed | Tagged , , , , , , , , | Leave a comment

Net Lima Building – green building in Philippines uses Ronacrete products


Monoprufe WP Elastic and Ronafix Mix A1 plus other specialist Ronacrete products have been used at this ‘green’ building in The Philippines which features a  facade that serves as sunshade and a glass curtain that minimizes solar heat gain.

Posted in Uncategorized | Tagged , , , , , | Leave a comment

Net Lima Building – green building in Philippines uses Ronacrete products


Net Lima Building, Philippines

Image | Posted on by | Tagged , , , , | Leave a comment

A Christmas message from Ronacrete


Christmas delivery times Our office and factory will be closed from 5.30pm on 23rd December 2013 and will reopen at 8.30am on 2nd January 2014. Please note that for us to guarantee standard delivery of materials before Christmas, orders must … Continue reading

Image | Posted on by | Tagged , , , , , , , , , , | 1 Comment

RonaScreed stands up in court


During busy court sessions the waiting area inside Oldham Magistrates Court frequently became overcrowded, so it was decided that the area should be expanded by removing the internal lobby, thus providing more space in the waiting area. A new lobby … Continue reading

Posted in Concrete, Damp Proof Membrane, screed | Tagged , , , , , , , , | Leave a comment